11.1 Secure receipt procedures 11.2 Public opening rules 11.3 Handling late or non-compliant tenders
12.1 Preliminary examination (completeness, compliance) 12.2 Detailed technical and financial evaluation 12.3 Clarifications and post-tender negotiations (if permitted) 12.4 Final comparison and recommendation Fidic Procurement Procedures Guide 1st Ed 2011 Free
Note: The official FIDIC Procurement Procedures Guide (1st Ed, 2011) is a copyrighted publication. The following is an academically reconstructed content outline for reference, not a substitute for the original document. 1st Edition – 2011 most economically advantageous tender (MEAT) 8
9.1 Design-build procurements (Yellow Book) 9.2 EPC/Turnkey projects (Silver Book) 9.3 Construction-only (Red Book) 9.4 Small works and plant contracts (Green and Blue Books) Part 4 – Tendering and Award Chapter 10 – Advertising and Invitation to Tender 10.1 Public notice requirements 10.2 Time limits for submission 10.3 Pre-tender conferences and site visits Fidic Procurement Procedures Guide 1st Ed 2011 Free
15.1 Key performance indicators (KPIs) 15.2 Progress reporting and inspections 15.3 Managing variations and change orders under FIDIC
8.1 Qualification criteria (technical, financial, legal) 8.2 Evaluation methods: lowest price vs. most economically advantageous tender (MEAT) 8.3 Weighting and scoring systems 8.4 Life-cycle costing